Learn what to expect when installing a geothermal furnace system by following a couple’s experience installing geothermal energy for the home.

This is part two in a three-article series on geothermal heat pumps. Part one can be found here.

Our geothermal installation took five days and was followed by an inspection and training session. The amount of time and effort involved in setting up a new system varies, depending on the location of your existing heating and cooling units in relation to where the ground loops enter your house, and on the location and configuration of your ductwork, electric wiring, and hot water heater.

Trench Digging and Pressurized Loops, Day 1

We awoke early in the morning as the ground loop installation crew arrived. A large flatbed trailer parked in front of our home, carrying an excavator and a compact track loader. This day’s work consisted of digging the horizontal trenches for the ground loops, laying the loops, replacing the removed soil, and running the loops into the back of the house.

  • Updated on Nov 8, 2022
  • Originally Published on Nov 2, 2018
Tagged with: Allison Ehrman, cooling, geothermal, heat pumps, heating, home energy, Maryland, Reader Contributions
Online Store Logo
Need Help? Call 1-800-234-3368